How to highlight tasks that are behind
Hi there, Can anyone tell me if there is a way for MS Project to automatically highlight tasks that are behind schedule? Thx heaps.
Last updated: -
Multiple project plan recommended construct
I have 10 plans to manage. I have MS Project 2003 standard. What is the best construct for managing all these plans? (Need to do EVA for all and in summary).
Last updated: -
Can I use database management and connect with other software in Microsoft Project?
Last updated: -
PowerPoint files are not opening
I made some presentation files for promoting our new business. I showed them to my boss. She was quite happy with my work and asked me to send them to our clients. Next day I sent them to all our clients. In the evening time boss got some mails from those clients that the files are not opening. So...
Last updated: -
MS Project 2007 – Working days
I want to set my working days to be MON-SAT (6 days a week) in MS project 2007. I am lost!
Last updated: -
I can’t open Microsoft Project file
Hi everyone! I have a problem… I can’t open microsoft project file. When attempting to open this file I receive an error message: "There was a problem opening this project last time, do you want to attempt a repair?" If I choose yes or no for the repair I still get the same result after, which...
Last updated: -
Project server 2007 – project check in failed at 37%
I have a problem with a project, since a week I'm no longer able to complete the check-in/publishing. the project seems to be corrupted. - Updates from resources fails in to be applied - cannot open the project with the MS Project client Any idea how to solve this problem? Project server 2007...
Last updated: -
I have MS Project server 2007 (S1), Project pro (2007), SharePoint Server 2007 (language pack [Turkish] installed on Server 2003 with MS SQL Server 2005. I have only one farm. I can see when I create a project on server and client side. however whenever I want to see preview of a task, it gives an...
-
Unable opening MS Project 2007 file
I had saved my MS Project 2007 file but when finally exited file did not save, then when I tried to reopen I get a blank file.
Last updated: -
Font setting in Microsoft Project
Is there a way to set a permanent font type in Microsoft Project?
Last updated: -
How to open corrupt Microsoft Project?
I have an MPP file, totally created in Project 2010, either hangs or causes Project 2010 to crash. Seems that there's some corruption in it. Have tried downloading the (few) solutions out there, without success. Not many good solutions it seems. Anyone have a clue to how resolve? This 7MB file is...
Last updated: -
What’s the difference between Aconext and Microsoft project?
Could you please advise me on what's the difference between Aconext and Microsoft project? Also, what's the difference between Aconex and Primevara soft for a project management system?
Last updated: -
Do you have a favorite construction project management software tool?
What is your favorite construction project management / scheduling software tool? Are you using Microsoft Project? What about Sage or Primavera? Viewpoint? Prolog? Something else entirely? What makes the software so appealing to you -- was there one feature that made you shout, "I need that now!"...
Last updated: -
How do I get subtasks like 1.1, 1.2,1.3 inserted after I get them to subtasks?
Last updated: -
Why when I type in a duration of 1 day does it span 2 calendar days?
Last updated: -
How do you edit a Header
Last updated: -
My project has several tasks each with resources assigned. Some of the resources work part time on more than one task. Occasionally a new hot task comes up and I need to move a resource off a task he is currently working on to the new task. This will cause the task he was moved off of to take...
Last updated: -
Project 2007 - Software 1. I have set a start date and have created an entire schedule, I now need to move the start date and keep the same sequences, but not all things are linked together - how do i do this? 2. Multiple times this may occur throughtout the project. If my project is delayed by...
Last updated: -
I am going to Tools - Tracking - Update Project -- I am updating the entire project and reschedule uncompleted work. I chose the date for the previous Sunday. This is a bran new plan so only 2 resources have coded hour to it, one of them was in a task alone and completed the task. There is a...
Last updated: -
Task Length in Microsoft Project 2003
Can I show a task that takes up 3 weeks to complete but reality is we can do it in one week. I only really need to worry when I have not started the task with only one week left
Last updated: