Hi!

Here the history of problem. Some time ago we had a following landscape: server1 with system SANDBOX and server2 with system TEST. We moved system TEST to server1. Now we have two systems – SANDBOX and TEST – on server1. Server2 has now the system PRODUCTION.

The problem is that we can’t start up systems SANDBOX and TEST simultaneously. We get in log:
“WARNING: Background job RDDIMPDP could not be started or terminated abnormally. Please check that the R/3 system is running. Please check the system. Use transactions SM21, SM37, SM50. WARNING: (This warning is harmless if no further warnings follow.)”

And transport requests from TEST to PRODUCTION hang. I think we need to reconfigure transport from SANDBOX to TEST with saving transport between TEST and PRODUCTION. But how? What to see, what to change? Please help.
ASKED: Jan 12 2009  3:56 PM GMT
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
0
5 pts.
0
A:
 RATE THIS ANSWER
0
Click to Vote:
  •   0
  •  0
  • AddThis Social Bookmark Button
Last Answered: Jan 12 2009  3:56 PM GMT by Toi101   5 pts.
0
0
Discuss This Answer:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _



0