We installed SAP SLD systems (NetWeaver 7.3 Java stack only) and connected our DEV/SBX to the design time system and all other systems to the PRD SLD.  We also stood up a backup SLD which is fully synch'd from the PRD SLD.  Since the beginning the change-log grew more than originally expected,...