1

Job Scheduler Authority
I have a operator that is unable to submit a job in the scheduler using the “Option 10 to Run Immediately”. He gets a error message “Not Authorized to user QSYSOPR” How do i authorize his group profile to user QSYSOPR? I’m not to familiar with the Job Scheduler and am looking for some help.

Answer Question   |  October 30, 2012  3:25 PM
Authority, JOB SCHEDULER
asked by:
10 pts.

Jobs scheduled on the new server i720 end with endcode 20, while the same jobs run perfectly in i520.
Hi, We are upgrading our server to an i720 (v6r1) from i520 (v5r4). Jobs scheduled on the new server i720 end with endcode 20, while the same jobs run perfectly in i520. The scheduled Jobs are used to call certain application program. when I check the job log, it says program not found in library [...]

Answer Question   |  March 31, 2012  6:25 AM
i5/0S, iSeries V6R1, JOB SCHEDULER, Job scheduling, V5R4
asked by:
75 pts.

DDM won’t copy when job submitted via JOBSCDE
I have 2 identical programs sending data to 2 remote systems. The only difference is the the DDM file points to a different box. Program A works fine to state A. Program B fails daily to state B. The error I am getting sending to state B is a CPI9161. Database TCP/IP or local socket [...]

Answer Question   |  March 31, 2012  4:04 PM
CPI9161, DDM, DSPJOBLOG, JOB SCHEDULER, Joblogs
asked by:
3,915 pts.

Transfering (save/restore) job scheduler from one AS400 to another
Other thanĀ a SAVSYS, which I believe saves the native job scheduler which can subsequently be restored, is there a way to simply save and then restore (on a different AS400) all the entries on the job scheduler on their own?

Answer Question   |  March 13, 2011  8:13 AM
AS/400, AS/400 job scheduler, JOB SCHEDULER, SAVSYS
asked by:
250 pts.

Native job scheduler
I have scheduled a job but that didn`t ran in native job scheduler..what could be the posible cause ?????

Answer Question   |  September 16, 2010  8:48 PM
AS/400, AS/400 job scheduler, AS/400 jobs, JOB SCHEDULER
asked by:
now
225 pts.

job scheduler email notification
Is there a way to initiate an email based on job results through the job scheduler?

Answer Question   |  November 8, 2010  3:24 PM
AS/400 job scheduler, JOB SCHEDULER
asked by:
15 pts.