Ask you virtualization questions to Microsoft's Kenon Owens a technical product manager. It goes from 11-2pm EDT http://itknowledgeexchange.techtarget.com/microsoft-virtualization-chat/
How long is the z9 hardware expected to be supported? Our mainframe is getting phased out and therefore we will not be able to upgrade from our existing z9 box. Ye, we may need to run on the z9 for a few more years.t
I'm running SAVCE 10.1 on a 2000 pro server virtual machine. I can't push the av client or definitions from the server. I can't update the client definitions from the server. However, all the clients see the correct parent server and are currently getting defs from the cloud. I only have one AV...
Hi we just received a new as400 i570 system. I would like to know how to create lpar using the hmc console. We have 16 processor and 192 g of memory. I need to create 4 lpars.
in my ibm server x3400 it shows that out of memory killed process ,plz suggest me how to solve this ?
Server operating systems, Memory management, IBM Server X3400
does anyone know how to take multiple heat summary's from EMC and combine them into one report, or spreadsheet, fairly easily? When you have about 100 hots to review it is very tedious to go through each heat report. EMC CE's I know have used some script to consolidate them...just curious if i have...
Can you upgrade the cd rom to accomodte a dvd rom or dvd r/w on a Dell 2800 Server
Can I configure my network to reroute traffic to one server, so I can edit my firewall rules in one place?
Our Data center has a 10,000A (6.5 MVA @220/380V, 60 Hz) rated capacity parallelling switchgear to supply critical load. However, the demand load is calculated @ 7.8 MVA. Our Electrical Consultant recommended a 4-2000KVA capacity prime generator, single paralleling digital switchgear(PSG). My...
Data center design and infrastructure, Data Center power management, data center generator
What are the networking cabling requirement to cater high speed data transfer between the clients to the network backbone?
I have a B.E. in Computer Science and Technology, and I am now attempting to complete MCSE and CCNA certifications. What are the job opportunities in India, and what are the salary ranges and growth potential?
Could the gas suppression cylinders be installed and stored inside a building. (FM 200). Should a data center services penetration be sealed with intumescent material.
Data Center Fire Suppression, Data center design, FM-200 Fire Suppression Systems
I want to ask about the difference between FM200 & NAF S125, and which one is better.
How does flywheel UPS work? Is there a diagram available to view?
Data center power supplies, Data center backup power, UPS battery
We are building out a site where the suites or modules are by Megawatt not square feet. We need to be flexible in the size of each suite and want to know what the data center industry considers, from a physical security standpoint, an adequate wall system. We prefabricate wall systems at the same...
Now that Nortel is bankrupt and being bought out by Avaya, does this mean my Nortel certifications are obsolete? Or is the situation too inconclusive to tell right now? If it's too soon to tell, what will the acquisition depend on to make my certifications matter? I'm also wondering whether...
Hello, we need to find how much of heating emission comes out of IBM Iseries/AS400 systems. Can someone help with this issue? Many thanks
Hi i am learner in Perforamance center. when i am going through some Perf center 9.5 articles "Step by step procedure of Perf Center testing" i got confuse here: my query is: Perf Center will have its own Controller, Vugen, Lgenerators or it will depend on Loadrunner components?? if it...


