• Auto Start Job

    How to set up ASJ.  Since I added a job (which was scheuded in WRKJOBSCDE) through ADDAJE .  I used QDFTJOBD as default description. But it is running in BCH type instead of ASJ.  I want to this CL should run automatically when sub system in active and condition mentioned in the CL is match.

    krisradhadd35 pointsBadges:
  • iSeries native job scheduler -QJOBSCD

    I had heard that the job QJOBSCD is related to native job scheduler and it is responsible for the job submission to JOBQ but when I had given command WRKACTJOB JOB(QJOBSCD), I could not find the job. It's still active and the job scheduler is working fine.

    Dinnu360 pointsBadges:
  • How to omit next run of job from advanced job scheduler by command

    Hello, I need to add an exit to the backup control group that will omit the next scheduled run of some job in JS. Please is there any direct command that can by use from command line to omit next run of job? There is option 17 in JS, but I can't find any command to do it.

    Majlosh5 pointsBadges:
  • Qbatch CPU limitation

    Dear all, Kindly note that I had sometimes on AS/400, some jobs running in Qbatch and take almost the whole CPU for long time. Any other interactive job that should have few seconds, takes longer time to be completed. Can we limit the CPU let say to 50% for Qbatch jobs? Thanks in advance, Wissam

    CaptainFAWAZ30 pointsBadges:
  • AS/400 Data area

    How to share the Data area for twojob, I have a COBOL program which submit the Purge job for one table, that table has so many records. So in turn, it submits so many jobs  for purge the same table but the job which submit first lock the data area, so the next jobs has been ended with error. Now I...

    12we40 pointsBadges:
  • Steps to debug the batch job which is active

    If a job is in held state, we can give STRSRVJOB and STRDBG and RLSJOB to debug the PGM. But I need the steps to debug the batch job which is active?

    dinuas400510 pointsBadges:
  • AS/400 handling Data Area

    I have used data area name count for randomly generating sequence number but I can't use two screen simultaneously. Its giving me run time error data area allocate to other job. I need to handle it through PSDS how could it done?

    Nikrajpapa230 pointsBadges:
  • Need to know whether a job is completed

    Hi, I need to submit 2 jobs JOB 1 and JOB2 but before doing a sbmjob on JOB2 i should make sure that JOB 1 has ended. How can i do that during program execution. Thanks.

    Rpgle25 pointsBadges:
  • AS/400 schedule job

    Hi All, I need some help on AS/400 schedule job because I'm new in AS/400. I have a file has two column which are code and time, now I want to run a program based on this files values like if code =1 and time =1.00 then call lib/xxx so on... in AS/400 schedule job dynamically. Thanks in advance.

    97834441841,400 pointsBadges:
  • What does “Job is not waiting for a specific message.” mean?

    My batch-job is most of the time in MSGW status, but when I take opt-7 against it it shows..."Job is not waiting for a specific message." What does it mean basically? I run EOD (End-Of-Day) job (i.e. my batch job), but these days it is taking much much longer time than usual. Please advice. Thanks...

    svankipu620 pointsBadges:
  • AS/400 future

    Hi, I'm working as an AS/400 developer over the past 3.6 years. I'm just bit worried about its future. Please suggest me whether to stay or change technology? What is going to happen to AS/400 developers in the future. Information and suggestions are really appreciated. Thanks in advance.

    ITas4005 pointsBadges:
  • Submitted AS/400 job it’s not found with SBMJOB command

    I have submitted job using command SBMJOB in RPG Program though QCMDEXC. In DBG mode, I checked this command executed successfully but I didn't find job name in system. I used WRKSBMJOB command to see what are all the jobs submitted but I have found my job.sbmjob cmd (call pgm (xyz) parm (&a...

    Askt1140 pointsBadges:
  • SBMJOB command: AS/400 job not found

    I have submitted job using command SBMJOB in RPG Program though QCMDEXC. But sometimes it's not working after submitted. SBMJOB CMD (call pgm (xyz) parm (&a &b)) Apart from above CMD, I need to specify anything else? Please advice.

    SBMJOB20 pointsBadges:
  • Multiple submission of a JOB

    Hi every one, Requirement 1.a : I have a CL program (ISC) which reads/process 10 Million records from an input file IF with some conditions and writes to a Output file OF1 with the help a RPG program R1. Now my requirement is to improve the performance of this read process by running/submitting...

    Sai4AS4001,420 pointsBadges:
  • Define query without WRKJOBSCDE

    How can I Define a query to run only Monday thru Friday not using WRKJOBSCDE (we have a customised WRKQRY) scheduler and doesn't have an option to input the schedule day e.g. *Mon *Tues =, etc....I'll like to see if any one knows how to Define the query using the DEFINE RESULTS FIELDS e.g....

    Querys100 pointsBadges:
  • Check each RPG/400 program in batch job

    I have a few programs to submit in batch but I need to check each program sucessfully then I need to call another program.

    Askt265 pointsBadges:
  • How to invoke an auto start job in COBOL/400?

    How can I invoke an auto start job in COBOL/400 application?

    mvrkrishna555 pointsBadges:
  • What’s the future of SAP in the industry?

    Hi, I'm a COBOL programmer working on mainframes with a work experience of 2 yrs. I've worked with technologies like JCL, COBOL, VSAM, DB2, IMS DB/DC, IDMS, FOCUS etc. I have an opportunity to get into SAP technical (ABAP/4) as a programmer in my organisation. Looking at the future prospects of the...

    ABAPer920 pointsBadges:
  • Hold all AS/400 print jobs for the same user

    How can I hold all the print jobs in the AS/400 for just one user, then have the same user to release all her jobs whenever she wants to print?

    Querys100 pointsBadges:
  • Jobs in AS/400

    Hi, There are 2 jobs running on the system. First one is in MSGW and second job is waiting for the completion of the first one. How to proceed in this situation? Regards, M

    mvrkrishna555 pointsBadges:

Forgot Password

No problem! Submit your e-mail address below. We'll send you an e-mail containing your password.

Your password has been sent to:

To follow this tag...

There was an error processing your information. Please try again later.

REGISTER or login:

Forgot Password?
By submitting you agree to receive email from TechTarget and its partners. If you reside outside of the United States, you consent to having your personal data transferred to and processed in the United States. Privacy

Thanks! We'll email you when relevant content is added and updated.

Following