We have a heavy batch atmosphere, at certain peak times, for only about 8 seconds, it appears the system is doing nothing. Our main subsystem and its subsequent jobs are set up to come out of *base pool with a max act level of 687. There are usually around 900 jobs with 1000 threads running. Should the max act level be raised, or is there a possible problem with journaling?
Software/Hardware used:
ASKED:
June 29, 2006 1:21 PM
UPDATED:
July 10, 2006 7:43 AM