 Design changes or modifications to Lotus Notes production database
Hi All, How do you change or modify the production database? What process do you follow in real-time when client(End user) needs any design change/modification in the applications? Thank, Sunny.

Software/Hardware used:
Lotus Notes
ASKED: February 26, 2011  3:14 PM
UPDATED: February 28, 2011  2:01 PM

Answer Wiki:
Modification of the Production Database is only to be done AFTER the changes have been tested out and validated on the trial-database or interim-database (there are a lot of other similar names). and the system found working properly. There is also the Configuration and Change Management Procedures that have to be followed with the proper documentation of the change required, reasons for the change, approvals for change by the CCC (Configuration Management Committee) and what not. Full details on how to run a Configuration and Change Management Procedures can be easily got from the net. This has to be done first BEFORE the item is moved to the trial database also.
Last Wiki Answer Submitted:  February 27, 2011  10:16 am  by  Mornshoe12   80 pts.
All Answer Wiki Contributors:  Mornshoe12   80 pts.
To see all answers submitted to the Answer Wiki: View Answer History.