 




<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: CMM (Capability Maturity Model)</title>
	<atom:link href="http://itknowledgeexchange.techtarget.com/itanswers/cmm-capability-maturity-model/feed/" rel="self" type="application/rss+xml" />
	<link>http://itknowledgeexchange.techtarget.com/itanswers/cmm-capability-maturity-model/</link>
	<description></description>
	<lastBuildDate>Fri, 24 May 2013 19:50:07 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	
	<item>
		<title>By: liberty</title>
		<link>http://itknowledgeexchange.techtarget.com/itanswers/cmm-capability-maturity-model/#comment-36896</link>
		<dc:creator>liberty</dc:creator>
		<pubDate>Wed, 22 Mar 2006 08:48:03 +0000</pubDate>
		<guid isPermaLink="false">#comment-36896</guid>
		<description><![CDATA[The Capability Maturity Model can be found by visiting Carnegie Mellon Institute for Software Development.  It&#039;s main purpose was to help software developers, testers, and Q/A people to better understand structured design, development, test &amp; implementation procedures for the new software design and implementation process. When a developer can master repeatedly the steps of meeting with the customer and identifying the needs of the customer, then flow through the software design, review, development, test, review, install/implement, and follow-up process repeatedly, then this will help reduce project scope changes, project install date creep, etc.  It teaches developers the way to do software changes in a structured way, when followed by all involved in the life cycle of software changes/new development, it helps all in the process.  Identifying meetings with the customer, when to hold them, how to handle meetings (at differents stages of the life cycle), which implements a better understanding of the required changes for all involved, (user, developer, testers, Q/A &amp; managers).  Study it, learn the process flow, implement it and reduce your project creep issues tremendously.  I was involved with Tinker Air Force Base, Software Quality Assurance group, and utilized this process which allowed the base to help implement CMM standards, the base went from a grade 0 to grade level 5 in less than 4 years for Software Q/A, (improved project control and implementation) using this practice, with 5 being the highest, with Tinker being the Leader in Quality control of software changes over 5 other bases being monitored and tested.  Believe in it, it works! REN   ]]></description>
		<content:encoded><![CDATA[<p>The Capability Maturity Model can be found by visiting Carnegie Mellon Institute for Software Development.  It&#8217;s main purpose was to help software developers, testers, and Q/A people to better understand structured design, development, test &amp; implementation procedures for the new software design and implementation process. When a developer can master repeatedly the steps of meeting with the customer and identifying the needs of the customer, then flow through the software design, review, development, test, review, install/implement, and follow-up process repeatedly, then this will help reduce project scope changes, project install date creep, etc.  It teaches developers the way to do software changes in a structured way, when followed by all involved in the life cycle of software changes/new development, it helps all in the process.  Identifying meetings with the customer, when to hold them, how to handle meetings (at differents stages of the life cycle), which implements a better understanding of the required changes for all involved, (user, developer, testers, Q/A &amp; managers).  Study it, learn the process flow, implement it and reduce your project creep issues tremendously.  I was involved with Tinker Air Force Base, Software Quality Assurance group, and utilized this process which allowed the base to help implement CMM standards, the base went from a grade 0 to grade level 5 in less than 4 years for Software Q/A, (improved project control and implementation) using this practice, with 5 being the highest, with Tinker being the Leader in Quality control of software changes over 5 other bases being monitored and tested.  Believe in it, it works! REN   </p>
]]></content:encoded>
	</item>
</channel>
</rss>

<!-- Performance optimized by W3 Total Cache. Learn more: http://www.w3-edge.com/wordpress-plugins/

Page Caching using memcached
Database Caching 3/10 queries in 0.038 seconds using memcached
Object Caching 267/273 objects using memcached

Served from: itknowledgeexchange.techtarget.com @ 2013-05-24 20:12:00 -->