Q:
Changing revision of existing production order
We have existing production orders on the floor which have since rolled a revision. Is there any way to transfer over from existing work order to a new production order that will show the new revision? What we currently do is manually cross out the old revision and write in the new one. The system, however, shows the old revision. How do I get the system to show the latest revision? Hope this is not confusing.
ASKED: Nov 14 2008  10:51 PM GMT
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
0
75 pts.
0
A:
 RATE THIS ANSWER
0
Click to Vote:
  •   0
  •  0
  • AddThis Social Bookmark Button
Is this a revision to the Bill of Materials or the Product that you are building with the Production Order?
Last Answered: Dec 3 2008  5:19 PM GMT by Decknix56   75 pts.
0
0
Discuss This Answer:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _



_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Rbarnhart   10 pts.  |   Apr 9 2009  6:28PM GMT

We had the same kind of problem and we used a tool call work order mass change. It allowed us to make all the changes we needed to in an excel spread sheet and update them all at once.

here is the link:
 <a href="http://www.prometheusgroup.us/products/Work_Order_Mass_Change/" title="http://www.prometheusgroup.us/products/Work_Order_Mass_Change/" target="_blank">http://www.prometheusgroup.us/products/W…</a>

 